High Speed Rail - https://www.highspeed.mtr.com.hk/en/main/index.html
- High-speed rail link between Hong Kong and China opened to the public on September 23, 2018
- Guangzhou: 48mins / Shenzhen: 14min
Fuzhou: 5.15hr / Wuhan: 4.5hr / Changsha: 3hrs - Co-location immigration arrangement. Easy connection with only 10 mins walk from Kowloon West Station to Kowloon station which connects to Hong Kong International Airport in only 22 mins.
Hong Kong – Zhuhai – Macau Bridge (HZMB)
https://www.hzmb.gov.hk/en/transport/local-public.html
- Officially opened on October 23, 2018
- 24 hours operation
- 40 mins only between Zhuhai and Hong Kong port, immigration process in 15 mins
- Frequent public bus connecting the bridge area with Hong Kong International Airport
- Connection from Western Guangdong to Zhuhai port:
Zhongshan: 1hr / Jiangmen: 1hr45min / Taishan: 1hr50min / Yangjiang: 2hr
Zhaoqing: 2hr45min / Yunfu: 3hr15min / Maoming: 3hr45min